Jim and I cabled up the Beckhoff serial lines at EX last Friday. This afternoon Daniel completed the Beckhoff configuration to read out the timing diagnostics from the EX Timing Fanout Unit into EPICS. The diagnostics are available on an MEDM screen, from the SYS part of the site overview (see attached). I need to add these diag channels to the DAQ tomorrow.