H1 General
ryan.crouch@LIGO.ORG - posted 16:31, Tuesday 24 September 2024 (80269)
OPS Tuesday day shift summary

TITLE: 09/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 147 Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: The LVEA remains in laser hazard. Maintenance ended a little late due to SR3 issues, locking also was a small struggle as ALS-Y wouldn't lock as it had low IR and green power. After ALS-Y was solved relocking has been great.
LOG:                                                                                                                                                                                                                                                                                                                                                           

Start Time System Name Location Lazer_Haz Task Time End
23:58 SAF H1 LVEA YES LVEA is laser HAZARD 18:24
14:34 FAC Chris Weldshop N Housekeeping, move forklift 17:06
14:54 FAC Kim EndX Y Tech clean 16:27
14:54 FAC Karen EndY N Tech clean 15:53
14:58 FAC Nelly HAM shack N Tech clean 15:59
15:00 CAL Tony PCAL lab Y PCAL work 15:27
15:04 CAL Dripta PCAL lab Y Check with Tony 15:27
15:05 ALS Keita EndY N Mode matching investigation 19:38
15:19 SUS Jason, Oli LVEA Y SR3 OPLEV centering, dead laser :( and translation stage 20:03
15:19 FAC Eric, Tyler FIre pump N Fire pump testing 16:04
15:34 CAL Tony, Dripta EndX Y PCAL measurement 19:09
15:37 FAC Betsy LVEA Y Talk to Jason 15:48
15:47 SQZ Sheila SQZ0 Y Pump align 18:13
16:04 FAC Eric Mech room N Heater coil repair 18:35
16:09 SEI Jim Office/EndX remote N BRS-X adjustments 17:55
16:16 VAC Travis LVEA Y Check feedthroughs 16:51
16:21 FAC Richard LVEA Y Check with Jason 16:37
16:26 EE Marc & Fernando EndX Y SUS DAC checks 17:13
16:27 FAC Kim, Karen Ham Shack N Tech clean 17:09
17:09 FAC Kim & Karen LVEA Y Tech clean 18:07
17:12 EE Fil MSR N Looking under the floors, wire routing for strobe light 20:18
17:12 FAC Christina Recieving N Forklift 17:46
17:12 FAC Tyler Lvea, Mids Y 3IFO checks 17:49
17:36 FAC Chris LVEA Y Load bearing labels for storage racks 18:32
18:06 PSL Fernando PSL racks N Checks 18:25
18:12 VAC Janos, Jordan, Travis FCT N Push a cleam room to the FCES 18:34
18:24 SEI Jim CR N ETMX BLND checks/tests 19:11
18:59 OPS RyanC LVEA Y Run out FARO laptop to Jason 19:12
19:43 ALS Keita EndX N Take pictures of racks 20:06
21:57 ALS Keita EndY Y ALS-Y table adjustment 22:33
22:33 CDS Tony EndX N WIFI investigation 23:10

Busy maintenance day, the work completed includes:

Team SR3 was the last one out and made sure the lights were off

Lock#1:

Images attached to this report