Reports until 16:25, Wednesday 25 September 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:25, Wednesday 25 September 2024 (80298)
Wednesday Ops Shift End

TITLE: 09/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Wind
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:

Day was full of Short locks that all eneded with PI ring ups.

Lockloss from a PI 24 ring up
https://ldas-jobs.ligo-wa.caltech.edu/~lockloss/index.cgi?event=1411331841
Screen shot. apparently the Lockloss page has no locklosses attributed to PI ring ups.

Relocking:
I did an Initial Alignment.
Wind is gusting above 40 mph
Holding ISC_LOCK in IDLE until the tumbleweed land.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
23:58 SAF H1 LVEA YES LVEA is laser HAZARD 18:24
15:19 PCAL Karen & Francisco PCAL lab yes Technical cleaning and storing parts. 15:37
16:45 FAC Eric EX & EY N Turning Down the Bugs the Bunnies alarm Volume at Chiller yards. 17:26
17:28 PEM Robert SR10 & Alabama N Checking along SR10 & Alabama for road Noise. 21:28
21:02 VAC Travis LVEA HAM6 Yes checking a feed through 21:22
Images attached to this report