TITLE: 09/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Calibration
OUTGOING OPERATOR: n/a
CURRENT ENVIRONMENT:
SEI_ENV state: USEISM
Wind: 10mph Gusts, 4mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.54 μm/s
QUICK SUMMARY:
- Tagged in to help cover the Day shift from TJ
- 2025 Out of OBSERVING for SRCL change by TJ and then went right into a simulines calibration measurement for Louis.
- 2115 had to run a 2nd simulines calibration (Louis)
- 2216 Lockloss while calibrators were working on calibration.
- 2244-2246 Returning CDS laptop to charger near CER (keita)
- H1 currently relocking as Oli has been taking over for the Evening shift.