Displaying report 1-1 of 1.
Reports until 12:43, Tuesday 08 October 2013
H1 SEI
hugo.paris@LIGO.ORG - posted 12:43, Tuesday 08 October 2013 (8037)
HEPI Controls - HAM2 position loops installed

Position loops were installed on HAM3-HEPI last week. UUG is 2Hz.

I installed the same controllers on HAM2 HEPI this morning. The phase margin is really high (above 60 degrees on every degree of freedom), so we can certainly raise the UUG and thus, push the performance.

Performance spectra were collected. They are attached to this post.

Controllers and simulations are also attached.

Spectra saved under the svn at:
SeiSVN/seismic/HEPI/H1/HAM2/Misc/DTT_Plots/
 - 2013_10_08_HAM2_HEPI_Pos_Loops_Perf.xml
 - 2013_10_08_HAM2_HEPI_Pos_Loops_Perf.pdf
revision# 7617

Non-image files attached to this report
Displaying report 1-1 of 1.