SQZ PMC PZT checker added to SQZ_MANAGER

The operator team has been noticing that we are dropping out of observing for the PMC PZT to relock (80368, 80214, 80206...).

There's already a PZT_checker() in SQZ_MANGER at FDS_READY_IFO and FIS_READY_IFO to check the OPO and SHG PZTs are not at their end of their range (OPO PZT re-locks if not between 50-110V and SHG PZT is 15-85V). If they are, it requests them to unlock and relock. This is to force them into a better place before we go into observing. 

I've added PMC to the PZT_checker, will relock if it's outside of 15-85V. Full range is 0-100V. SQZ_MANAGER reloaded. Plan to take GRD though DOWN and back to FDS. 