corey.gray@LIGO.ORG - posted 16:17, Tuesday 10 May 2011 (805)
BSC ISI Assembly Status

(Corey, Eric, Jeff, Jim)

Continued to do what was needed to fascilitate BSC Assembly.  This occurred mainly on two fronts (with a third attack at the end of the day).

Hunt For Missing Hardware

Decided to go through all the class-A-ed BSC Hardware.  This yielded some missing washers.  Since some SUS hardware turned out to be in an SEI bag, Jeff B. scoured SUS hardware and found some bolts for us.  Now we are down to just two missing pieces of hardware:  3/8-16 x 2 1/4" & 3/8-16 x 2 3/4" SHCS. 

Filled up most of our empty Cleanroom racks with all kinds of hardware today (still have a few bags to forage through upstairs).  For today, roughly 12 man-hours was devoted to searching for missing parts.  

Clean & Bake Assistance

To help get some of our plates through the process, some manpower was used to help out at the VPW.

Optics Table Flipper & Reaming Hardware

This stuff was recently Class-B-ed.  The SEI team is checking for fit as I type.