Reports until 15:51, Tuesday 08 October 2013
H1 SUS
betsy.weaver@LIGO.ORG - posted 15:51, Tuesday 08 October 2013 - last comment - 10:52, Thursday 17 October 2013(8054)
ETMx SUS cables connected

Betsy, Travis

This afternoon, we connected the 5 ETMx SUS cables and the ringheater cable to the inside of the feedthru flange.  We then had issues with signal faults.  We investigated and found the out-of vac cables not plugged in well at the outside of the feedthru.  Apon fixing, all looked well with the signals.  The suspension is still not fully suspended although we pulled out all of the extra teflon stopping brackets and prepped it for full unlock after SEI is done float/balance, after IAS is done figuring out where to put us.

Comments related to this report
jim.warner@LIGO.ORG - 10:52, Thursday 17 October 2013 (8140)

Note - Yesterday (Oct 16) we discovered that we had incorrectly pugged the cables into the internal side of the feedthru.  This was due to the fact that the cable connectors were mounted in the table bracket slightly incorrectly.  We remedied this yesterday.