TITLE: 10/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Currently relocking and at MAX_POWER . We took a few extra hours after the normal maintenance period to continue troubleshooting the PSL issues, but it didn't come up with much.
When I took SEI_ENV to MAINTENANCE we lost lock (most likely due to increased ground motion from septic tank truck + MAINTENANCE mode switch)
LOG:
14:30 Locked for 3 hours and running magnetic injections
14:40 Injections done, back to Observing
14:45 Out of Observing, starting In-Lock SUS Charge measurements
15:10 Took SEI_ENV to MAINTENANCE
15:10 Lockloss due to ground motion while in MAINTENANCE
15:28 ISC_LOCK to IDLE
21:46 Sensor correction turned back on
21:52 Started manual initial alignment
22:29 Started relocking
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:57 | FAC | Chris | H2/CP1 | n | Moving snorkel lift to CP1 | 15:28 |
14:42 | Christina | MX, MY | n | Inventory for 3IFO | 15:56 | |
15:12 | FAC | Kim, Karen, Patty | FCETube | n | Tech clean | 18:23 |
15:18 | VAC | Jordan | FCETube | n | Installing pressure gauge and closing gate valves | 20:03 |
15:21 | EE | Fil | Beir Garden, CER | n | Prepping for seismometer | 17:21 |
15:21 | Betsy | LVEA | n | O5 cabling tasks | 15:33 | |
15:36 | SUS | RyanC | CR | N | OPLEV charge measurements, ETMs | 16:54 |
15:54 | Betsy | OptLab | n | 16:54 | ||
15:56 | Christina | LVEA | n | Inventory walk around | 17:21 | |
15:00 | FAC | Septic tank vendor | sitewide | n | Pumping tanks | 16:13 |
16:17 | FAC | Tyler | LVEA | n | Looking for forklift | 16:23 |
16:29 | ISI | Jim | CER | n | Power cycling ITMX ISI | 17:07 |
16:40 | Camilla | LVEA | n | Looking at arms | 18:27 | |
16:45 | EE | Fernando | MSR | n | Check ISC computer | 22:42 |
16:54 | tour | Cassidy and Austin | LVEA | n | tour | 17:33 |
17:11 | CDS | Erik | EX | n | Power cycling gps receiver | 17:57 |
16:00 | FAC | Chris, Eric | Opticslab | n | Taking apart fume hood | 17:29 |
17:37 | Betsy | LVEA | n | Looking at things with Camilla | 18:23 | |
17:58 | ISI | Jim | LVEA | n | Moving stuff | 18:08 |
18:10 | ISI | Jim | LVEA | n | Checking problem out | 18:55 |
18:24 | Christina | Outside receiving | n | Throwing away stuff | 18:52 | |
18:29 | CDS | Erik | EX | n | Taking out gps receiver | 18:55 |
19:06 | Tony | LVEA | n | sweep | 19:23 | |
19:20 | PSL | Sheila, Rick | LVEA | n | Testing stuff with NPRO | 19:23 |
19:30 | VAC | Janos | FCETube | n | gate values | 20:03 |
19:35 | FAC | Karen | Pre-VacPrep | n | Tech clean | 20:16 |
19:43 | CDS | Erik | EX | n | Replacing receiver | 20:12 |
20:25 | PSL | Sheila, Rick | LVEA | n | Unplug another cable for PSL issue | 20:35 |
20:50 | Camilla | LVEA | n | Grabbing beamsplitters | 21:17 | |
21:26 | PSL | Sheila & Rick | LVEA PSL Racks | N | Re-seating the DB cables and Barrel conectors. | 21:33 |