Reports until 16:57, Thursday 10 October 2024
H1 General (DetChar, PEM)
oli.patane@LIGO.ORG - posted 16:57, Thursday 10 October 2024 (80605)
Ops Day Shift End

TITLE: 10/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 158Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Currently Observing at 158Mpc and locked for 5 hours. A lot of time out of Observing today due to continued PSL troubleshooting and commissioning. Relocking after our one lockloss wasn't too bad.
LOG:

14:30 Observing and Locked for 4 hours

15:02 Out of Observing for Commissioning
15:29 Lockloss
    16:24 Going through CHECK_MICH_FRINGES a second time, so decided to run an initial alignment only for PRC, MICH, and SRC
    15:29 manual initial alignment done, relocking
    16:39 Lockloss from LOCKING_ALS
    16:49 IDLE for PSL power swap
    17:45 Started relocking
    17:51 Lockloss from ACQUIRE_DRMI_1F
18:42 NOMINAL_LOW_NOISE
20:25 Observing

21:45 Out of Observing to run calibration sweep
22:51 Observing

23:25 - 23:37 Trash truck onsite - tagging PEM, DetChar                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

Start Time System Name Location Lazer_Haz Task Time End
15:17 FAC Tyler   n Running well pump (started 14:55) 19:11
16:56 PSL RyanS, Fil, Fernando LVEA n Swap power box 17:18
16:56 FAC Tyler YARM n Driving along YARM backside 18:17
17:21 PSL RyanS, Fil LVEA n Re-swap power 17:47
19:14 FAC Tyler   n Running well pump 20:14
19:16   Sheila LVEA n Plugging cable in 19:25
20:20   Sheila LVEA n Unplugging cable 20:25
21:24 VAC Fil, 1 VAC guy YARM n Fixing solar panel 22:47