H1 SEI
hugo.paris@LIGO.ORG - posted 14:38, Wednesday 09 October 2013 (8065)
SEI Status

HughR, HugoP, 

Here is the current status of the aLIGO SEI work at Hanford. Everything in red is a change from last status. Everything in green is available.

 

·         BSC1 - ITMY

o    ISI + HEPI - Unlocked, Previously commissioned. Performance Spectra

·         BSC2 - BS

o    ISI + HEPI - Unlocked, Previously commissioned. Performance Spectra 
 

·         BSC3 - ITMX

o    ISI : Chamber-Side testing complete. Report validated. Ready for cartridge install. 

o    HEPI : Locked. Model is running. Electronics ready for turn on.

 

·         BSC9 - ETMX

o    ISI : Locked. Chamber-Side testing complete. Report Validated. Cartridge installed.
             Needs balancing

o    HEPI : Unlocked, ongoing initial alignment.

·         BSC10 - ETMY

o    ISI : Currently installed in BSC6. Will be pulled out and installed in BSC10. Payload (SUS) will be moved then. Electronics are disconnected

o    HEPI : Unlocked.

         HAM 1

o    HEPI: Locked (09/18/13) and vented.
      Low priority testing 
      One L4C needs to be replaced: H2
      One actuator is weak: V4 It is 20% weaker than its counterparts. Likely clogged. May require replacement further down the line.

·         HAM2

o   ISI: previously commissioned with HEPI locked (recent performance spectra - not calibrated in higher frequencies), currently unlocked, in vacuum

o   HEPI - IPS position loops and alignment offsets installed - recent performance spectra
     Unlocked 07/23

·         HAM 3

o   ISI: previously commissioned with HEPI locked (recent performance spectra - Calibrated), currently unlocked, in vacuum
     Sensor correction installaton started.
     New blend filters installed. aLigo Blend filters on all DOF but RX and RY. eLigo high roll off blend filters on RX and RY. Performance Spectra.

o   HEPI - IPS position loops and alignment offsets installed - recent performance spectra
     Unlocked 07/23

·         HAM 4 

o   ISI: In chamber, Previously tested during assembly validation, currently locked, no suspension installed, in-vac cables not connected.
     Electronics ready, in field cables ready, in-rack cables ready. Temporary STS cables
     Model is running, and MEDM screens are available in the Sitemap.

o   HEPI: Currently locked, to be commissioned
     Electronics ready, in field cables ready, in-rack cables ready. Temporary STS cables
     Model is running, and MEDM screens are available in the Sitemap.

·         HAM 5

o   ISI: In Chamber, Previously tested during assembly validation, currently locked, no suspension installed, in-vac cables not connected,
     Chamber temporarily closed.         
     Electronics ready, in field cables ready, in-rack cables ready. Temporary STS cables
     Model is running, and MEDM screens are available in the Sitemap.

o   HEPI: Currently locked, to be commissioned     
     Electronics ready, in field cables ready, in-rack cables ready. Temporary STS cables
     Model is running, and MEDM screens are available in the Sitemap.

·         HAM 6

o   ISI: 
     in chamber.
     Unlocked, no SUS
     Mechanical adjustments complete
     Initial in-chamber testing complete, but not validated yet

o   HEPI: Unlocked - Ongoing commissioning

 

·         Guardian:
                            Transition scripts ready
                            Transition scripts work under guardian interpreter
                            alarm.txt files ready
                            snap files ready

 