Displaying report 1-1 of 1.
Reports until 16:38, Wednesday 16 October 2024
LHO General
corey.gray@LIGO.ORG - posted 16:38, Wednesday 16 October 2024 (80718)
Wed EVE Ops Transition

TITLE: 10/16 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Earthquake
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 23mph Gusts, 13mph 3min avg
    Primary useism: 0.07 μm/s
    Secondary useism: 0.21 μm/s
QUICK SUMMARY:

Walked in to Tony locking H1 at PRMI and he just left as it was on its way to MAX POWER.  (The DRMI lock & ASC step were a bit odd with POP18+90 making several sharp drops....but it obviously made it through that rollercoaster.)

Several EQs over last 24hrs; useism is squarely between the 50th & 90th percentile lines; winds had been elevated the last 2hrs, but appear to be dropping.

Displaying report 1-1 of 1.