TITLE: 10/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 20mph Gusts, 13mph 3min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY:
Lockloss from SQZrs PSAM activity.
https://ldas-jobs.ligo-wa.caltech.edu/~lockloss/index.cgi?event=1413215714
Relocking notes:
I had IMC Locking issues before entering into Initial_Alignment.
And then I had IMC Locking Issues in SR2 Alignment as well making Initial_Alignment incredibly difficult to Get into and Complete.
Sheila asked me to just take the IMC to Offline and wait until the PSL glitches stopped so we waited abotu 20 minutes.
Took ISC_LOCK back to down and started a Manual Initial_Alignment @ SR2 Align.
Reached Nominal Low Noise at 18:51 UTC
Commissioning activities started with: