Roof Progress

Roof work is progressing well.

The first 3 photos show a mid station ready for sheet metal trim installation. All four out buildings are at this stage.

Other photos show the upper level of the LVEA about 1/2 covered with membrane and the lower part (OSB) staged with materials.