Displaying report 1-1 of 1.
Reports until 10:43, Tuesday 22 October 2024
H1 CDS
erik.vonreis@LIGO.ORG - posted 10:43, Tuesday 22 October 2024 (80817)
CNS power supply replaced at EY

Because of the failure of the  CNS power supply at EX, which was the same age as the power supply at EY, and because of some glitches starting to occur with GPS 1 PPS signal from the CNS at EY, I replaced the power supply for the CNS at EY.

 

relevant alogs here:

 

https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=80742

https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=80537

Displaying report 1-1 of 1.