Displaying report 1-1 of 1.
Reports until 16:35, Friday 25 October 2024
H1 General (Laser Transition, VE)
ryan.crouch@LIGO.ORG - posted 16:35, Friday 25 October 2024 (80875)
OPS Friday day shift summary

TITLE: 10/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Tony
SHIFT SUMMARY: NPRO swap continues...
LOG:                                                                                                                                                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
15:10 SAF LVEA LVEA N LVEA is LASER SAFE 16:34
15:30 TCS TJ LVEA N Looking for TCS pipe fittings 15:53
15:49 PSL RyanS, Jason PSL encl Y NPRO work, camera check 19:07
16:28 OPS Oli LVEA N->Y LAZER HAZARD transition 16:31
16:34 SAF LVEA LVEA Y LVEA is LASER HAZRD 15:14
16:50 SQZ Vicky, Sheila LVEA Y SQZT0 work 18:56
18:17 TCS Camilla, TJ Mech rm, LVEA Y Drain CO2Y chiller 19:20
18:21 SUS Rahul Optics lab N Look for HTTS parts 18:34
18:21 FAC Mitch LVEA Y East bay inventory 18:34
20:01 CAL Tony, Neil PCAL lab Y PCAL measurement prep 20:07
20:03 TCS TJ, Camilla, Brice Mech room N CO2 laser swap 21:00
20:07 CAL Tony, Neil EndY Y PCAL measurement 22:18
20:30 SQZ Sheila, Vicky LVEA Y SQZT0 work 22:56
20:45 PSL Jason, RyanS PSL laser room Y NPRO swap 23:34
21:10 TCS Camilla, TJ LVEA Y TCS table work, CO2Y 21:47
21:47 SUS TJ Optics lab N Find TTS 22:03
22:32 CAL Francisco PCAL lab Y Laptop dropoff 22:47
22:33 CAL Tony PCAL lab Y PCAL post 22:55
Images attached to this report
Displaying report 1-1 of 1.