Displaying report 1-1 of 1.
Reports until 12:56, Friday 11 October 2013
H1 PSL
peter.king@LIGO.ORG - posted 12:56, Friday 11 October 2013 (8088)
Outer Loop Photodetector Array Setup
An NPRO was setup for aligning and testing the outer loop power stabilisation photodetector array in the H2 PSL Laser Area Enclosure.  The power incident on the array was measured to be 250-260 mW, the beam diameter close to the location of the 8 individual photodiodes was about 800 microns.
Images attached to this report
Displaying report 1-1 of 1.