Reports until 16:42, Wednesday 11 May 2011
LHO FMCS
kyle.ryan@LIGO.ORG - posted 16:42, Wednesday 11 May 2011 (809)
GV11 annulus passed vent test
Vented GV11 body flanges and bonnet annulus volumes and did not observe a pressure communication to CP4 -> disconnected flex line portion of plumbing connecting the to-be-removed-spool between GV11 and BSC6 and blanked-off line -> pumped out GV11 with aux. turbo cart and restored GV11 pumping back to the ion pump.