We installed C P Stat on the X arm tube opening where the spool was removed yesterday. We also lowered the clean room over BSC 3 to prepare for cartdrige install early Monday. I did a recheck of the upper limit on the main crane and found that the block was traveling up just a little to close to the drum so I adjusted the anti two block limit and it is ready to go.