Displaying report 1-1 of 1.
Reports until 16:26, Tuesday 29 October 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:26, Tuesday 29 October 2024 (80927)
OPS Eve Shift Start

TITLE: 10/29 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 14mph Gusts, 9mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.23 μm/s
QUICK SUMMARY:

IFO is LOCKING at PRMI

PSL Maintenance was ongoing throughout the day with PSL work finished (for now).

We've gone through a manual initial alignment and are now locking, which is apparently optimistic.

Displaying report 1-1 of 1.