Displaying report 1-1 of 1.
Reports until 07:34, Tuesday 05 November 2024
LHO General
corey.gray@LIGO.ORG - posted 07:34, Tuesday 05 November 2024 (81064)
Tues DAY Ops Transition: Maintenance Day

TITLE: 11/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 27mph Gusts, 17mph 3min avg
    Primary useism: 0.08 μm/s
    Secondary useism: 0.33 μm/s
QUICK SUMMARY:

H1 had a couple hours of Observing last night, and h1 was powering up as I walked in.  Today is Maintenance Day with PSL, HAM6 and CDS items on the docket. LVEA is laser HAZARD.

Winds died down around midnight last night and this is when H1 had chances at NLN.  Microseism is mostly beneath the 95th percentile and continues trend down.

Displaying report 1-1 of 1.