WP 12189
Entry for work done on 11/5/2024
Cabling and electronics were installed for a huddle test of HS-1 seismometers. A BNC cable was pulled from the Biergarten to the SUS-R3 PEM patch panel. A L4C Interface chassis S1600256 was installed in TCS-C1 rack, U16. Signal will be routed to a PEM AA chassis. Chassis is powered off. Sensor will be connected next Tuesday.