H1 CDS (SEI)
filiberto.clara@LIGO.ORG - posted 09:00, Wednesday 06 November 2024 (81095)
NN Huddle Test Setup

WP 12189

Entry for work done on 11/5/2024

Cabling and electronics were installed for a huddle test of HS-1 seismometers. A BNC cable was pulled from the Biergarten to the SUS-R3 PEM patch panel. A L4C Interface chassis S1600256 was installed in TCS-C1 rack, U16. Signal will be routed to a PEM AA chassis. Chassis is powered off. Sensor will be connected next Tuesday.