TITLE: 11/11 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 157Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
The morning was a little shakey, but we persevered through the problematic IMC glitches to get to a lock by 22:35 UTC
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
21:41 | SAF | Laser | LVEA | YES | LVEA is laser HAZARD | 08:21 |
18:30 | PEM | Robert | LVEA | Yes | Getting more spools of cable | 18:39 |
18:48 | PEM | Robert | CER | No | Checking cables | 20:10 |
21:29 | BBSS | Ibrahim | Staging Building | N | BBSS inventory | 00:29 |