Reports until 15:51, Monday 11 November 2024
LHO General (PSL)
ibrahim.abouelfettouh@LIGO.ORG - posted 15:51, Monday 11 November 2024 (81204)
OPS Eve Shift Start

TITLE: 11/11 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 31mph Gusts, 23mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.55 μm/s
QUICK SUMMARY:

IFO is in DOWN and CORRECTIVE MAINTENANCE

Due to microseism and high winds, we are unable to lock. As such, we're using this as an oppurtunity to troubleshoot and debug possible issues in PSL/IMC lock story.

Camilla has a great summary of the PSL story so far in alog 81193.