Displaying report 1-1 of 1.
Reports until 16:27, Monday 11 November 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:27, Monday 11 November 2024 (81206)
Monday Ops Day Shift End

TITLE: 11/12 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:

H1 Holding ISC_LOCK in IDLE with the IMC locked, BUT with the ISS and the FSS are turned OFF.

Note: note FSS has to be ON to lock the IMC , once locked turn it off.
Using this command to open the ndscope ~/../sheila.dwyer/ndscope/PSL/PSL_fast_channels.yaml
We are watching H1:PSL-PMC_MIXER_OUT_DQ for glitches.


LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:41 SAF Laser LVEA YES LVEA is laser HAZARD 08:21
16:20 FAC Karen Optics & Vac Prep N Technical Cleaning 16:47
16:43 PSL-ISS Sheila Ctrl Rm N ISS investigations. 19:43
16:47 FAC Karen MY N Technical cleaning 17:57
17:14 PSL-ISS Sheila & Elenna LVEA YES Pluggin in a cable for ISS injection 17:27
18:39 FAC Kim MX N Technical Cleaning 19:27

 

Displaying report 1-1 of 1.