Displaying report 1-1 of 1.
Reports until 10:21, Tuesday 12 November 2024
H1 PSL
daniel.sigg@LIGO.ORG - posted 10:21, Tuesday 12 November 2024 (81223)
Power down unused PSL equipment

Image 1: PSL top eurocrate
From left to right: ISS inner loop, old ISS second loop (depowered), reference cavity heater (depowered), and TTFSS field box.

Image 2: PSL bottom eurocrate
From left to right: injection locking field box (depowered), injection locking servo (depowered), monitor field box, PMC locking field box, and PMC locking servo.

Images attached to this report
Displaying report 1-1 of 1.