Displaying report 1-1 of 1.
Reports until 16:45, Tuesday 12 November 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:45, Tuesday 12 November 2024 (81231)
Tuesday Maintance Ops Shift End

TITLE: 11/13 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
H1 was held in IDLE all day while we had a long maintenance day with a focus on the PSL's TTFSS repair.

The PSL Crew is still in the PSL room, re-installing the TTFSS.
Secondary microseism is still elevated wind is still elevated as well.  

Beckhoff updates were done today at 4PM as well.


LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:41 SAF Laser LVEA YES LVEA is laser HAZARD 08:21
15:32 FAC Karen Optics & VAC Prep Labs N Technical cleaninng 15:42
15:42 FAC Karen EY n Technical Cleaning. 17:01
15:55 FAC Nelli HAM Shaq N Technical Cleaning 16:41
15:56 FAC Kim EX N Technical Cleaning 17:21
16:30 SEI Neil, Jim, Fil LVEA Beirgarden yes Installing GeoPhone Seimometer 19:23
16:46 3IFO Tyler LVEA Yes 3 IFO Checks 17:22
16:57 PSL Jason & Ryan S PSL Room Yes Working on PSL, PMC,  TTFSS 18:41
17:11 SUS Rahul EY & EX N SUS Measurements 18:39
17:13 CDS Richard CER N Maximizing the window for Maintenance 17:16
17:15 N2 NorCo Y arm N N2 fill, another Nor Cal Truck also went down the Y arm 19:15
17:22 FAC Tyler Mid Stations N 3 IFO checks 19:22
17:39 pSL Daniel PSL racks Yes Removing power from old PSL rack equipmnt 19:39
17:45 VAC Travis & Janos EY & MX N Checking vac pump status in Recieving areas 19:39
17:51 FAC Kim & Karen LVEA YES Technical Cleaning Karen out early 19:04
18:30 SEI Neil D. LVEA Yes Taping a GeoPhone to the Floor. 18:50
18:57 SEI Neil CER N Turning on a switch in the CER 19:14
19:05 FAC Kim High bay n Tech clean 20:03
20:08 VAC Janos EY, MX N Vac Hardware check. 22:08
20:58 PSL Daniel LVEA PSL Racks Yes Checking on the FSS 21:51
21:14 FAC Erik Tyler Mid Y N Handling the Air , Tyler back early 22:36
21:41 ISC Christina EY, MX n Inventory 22:16
21:47 PSL Ryan S & Jason PSL Yes Replacing the TTFSS 01:48
22:01 VAC Travis MX N Vac systems check 22:20
22:07 EE Fil CER N Turning on High Voltage 22:17
23:22 VAC Janos Mid X N Measuring Vac system equipment. 23:34
23:47 SEI Jim CER N checking cables 23:52
23:54 CDS Erik CER N Getting a laptop 00:00

 