TITLE: 11/13 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Slow start to locking at the beginning of the shift, but once PSL work was done, ran an alignment and returned to locking (had one lockloss due to PSL/IMC), then made it to NLN/Observing and had a "normal lockloss" (i.e. NOT PSL/IMC).
Probably old news, but it feels like after locklosses DRMI/PRMI have been pretty misaligned. Sometimes fixed by CHECK MICH FRINGES/PRMI, but sometimes a full INITIAL ALIGNMENT is required. (Running 2nd Initial Alignnment of the shift before the end of the shift.)
Microseism is still high but winds calmed during this shift.
LOG: