TITLE: 11/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: We spent the day in IDLE again investigating the PSL issues, we've had only the PMC locked for most of the day. At the end of the shift, the power supply for the PLS was swapped. Microseism has slowly starting to come down in the last ~5 hours. We are going to remain DOWN again tonight.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
21:17 | SAF | LVEA LASER SAFE | LVEA | N | LVEA IS LASER SAFE | 01:17 |
17:05 | PSL | Jason | CER, LVEA | N | Revive the PSL NPRO | 17:17 |
17:26 | FAC | Karen | Optics lab, vac prep | N | Tech clean | 18:26 |
17:40 | PSL | Jason, Marc | CER | N | Turn off PMC HV and unplug db37 cable | 17:46 |
18:41 | FAC | Christina | Mids | N | Check out storage | 20:02 |
18:48 | PSL | Jason | LVEA, CER | N | Take pictures | 18:51 |
19:03 | FAC | Kim | H2 enc | N | Tech clean | 20:17 |
19:13 | FAC | Karen | Woodshop, fire pump | N | Tech clean | 19:26 |
19:25 | VAC | Janos | MidY | N | Mech room, pump checks | 20:25 |
21:37 | VAC | Janos | MidX | N | Pump checks | 22:00 |
23:10 | PSL | Jason, RyanS | LVEA, Optics lab | N | Grab power supply and swap it | 23:43 |
23:56 | PSL | Fil | CER | N | Plug back in DB37 for the FSS | 00:08 |