Displaying report 1-1 of 1.
Reports until 07:51, Monday 25 November 2024
LHO General
corey.gray@LIGO.ORG - posted 07:51, Monday 25 November 2024 (81456)
Mon DAY Ops Transition

TITLE: 11/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 1mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.48 μm/s
QUICK SUMMARY:

H1 had  another 15+hr lock w/ a lockloss overnight (which is most likely due to a M4.6 earthquake 200 miles off the WA coast and NOT IMC or FSS!); TJ needed to assist H1 during his owl shift.  H1 currently at just under 5hrs for current lock. 

Environmentally, a slight increase in µseism to start touching the 95th percentile, otherwise quiet with no wind.  Today it looks like they are pouring concrete at the new Warehouse next to the Staging Building.

Monday morning, but not sure if there is commissioning time on the docket.

Displaying report 1-1 of 1.