This morning, Commissioners wanted suite of calibration measurements run. Broadband measurement was run first with Squeezing, but after this measurment I paused to let them take H1 to No Squeezing (I believe they did this because they didn't want calibration to affect their squeezing work). Then proceeded with the "non-standard" simulines measurement---where,"non-standard" is measurement is what Louis Dartez has specifically been requesting for H1 (see below).
Measurement NOTES:
- Following instructions (link).....EXCEPT: For simulines measurement run this file per Louis D.'s request:
- " gpstime;python /ligo/groups/cal/src/simulines/simulines/simuLines.py -i /ligo/groups/cal/H1/simulines_settings/newDARM_20231221/settings_h1_20241005_lowerPcal_higherPUM.ini;gpstime "
- H1 at NLN for for over ~5.5+hrs
- Calibration_Monitor medm screenshot is attached
- 1636 Out of Observing for commissioning
- 1637 - 1642 Broadband measurement run
- Measurement at: /ligo/groups/cal/H1/measurements/PCALY2DARM_BB/
- 1647 - 1711 Simullines measurement
- Before starting this measurement, Commissioners took H1 to No SQUEEZING, and then we started simulines
- gps START time: 1416588461.478124
- gps STOP time: 1416589887.051360
- Files writtten to subfolders here: /ligo/groups/cal/H1/measurements
- Let commissioners know when calibration was complete and they brough back squeezing
- Then ISC_LOCK was taken back to NLN for commissioning