corey.gray@LIGO.ORG - posted 09:27, Monday 25 November 2024 (81461)
H1 Calibration Measurement For Mon Commissioning (broadband headless + non-standard simulines)

This morning, Commissioners wanted suite of calibration measurements run.  Broadband measurement was run first with Squeezing, but after this measurment I paused to let them take H1 to No Squeezing (I believe they did this because they didn't want calibration to affect their squeezing work).  Then proceeded with the "non-standard" simulines measurement---where,"non-standard" is measurement is what Louis Dartez has specifically been requesting for H1 (see below).

Measurement NOTES: