I edited the sys/h1/guardian/injparams.py and sus/h1/guardian/SUS_CHARGE.py code to move the magnetic injections and in-lock charge measurements 20 minutes earlier tomorrow, usual start times are 7:20am and 7:45am. Moved to 7 am and 7:25am, should be over by 7:40am. If we drop out of observing, can an operator please reload PEM_MAG_INJ and SUS_CHARGE guardians.
Aim to turn CO2 laser off at 7:40am tomorrow, before the lockloss to see if we see similar SQZ alignment changes related to CO2 lasers as LLO does: 72244.