Reports until 10:11, Tuesday 26 November 2024
H1 PSL
ryan.short@LIGO.ORG - posted 10:11, Tuesday 26 November 2024 (81489)
PSL Rotation Stage Calibration

Following instructions in alog79596, I took the opportunity this morning to calibrate the PSL rotation stage since it hasn't been done following the most recent NPRO swap.

The measurement file, new calibration fit, and screenshot of newly accepted SDFs are attached.

  Power in (W) D B (Minimum power angle) C (Minimum power)
Old Values 97.433 1.990 -24.797 0.000
New Values 94.944 1.990 -24.793

0.000

Images attached to this report
Non-image files attached to this report