ryan.short@LIGO.ORG - posted 16:30, Tuesday 26 November 2024 (81501)
Ops Day Shift Summary

TITLE: 11/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 156Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Busy but easy maintenance day followed by a fully automatic, albeit longer than usual, lock acquisition. H1 has been observing for almost 3 hours now.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:10 TCS Camilla Opt Lab n Retrieving beam profiler 16:16
16:13 FAC Richard, Jordan, Ken LVEA n Walkabout 16:55
16:14 CAL Tony, Dripta PCal Lab n Retrieving equipment for measurement 16:21
16:17 TCS TJ, Camilla EY YES Table measurements 17:54
16:23 CAL Tony, Dripta EX YES PCal measurement 19:15
16:28 FAC Kim FCES n Technical cleaning 17:05
16:35 ISC Fil CER n Swapping 35MHz LO 16:38
16:52 ISC Daniel, Vicky LVEA, EX, EY - Adjusting laser temps 17:48
16:55 FAC Christina LVEA n Property checks 17:09
17:00 SEI Jim, Neil LVEA n Swapping seismometer 17:17
17:04 FAC Eric   n Running fire pumps 17:56
17:06 FAC Kim LVEA n Technical cleaning 18:24
17:09 FAC Christina MY n Looking for crates 17:44
17:12 CDS Marc, Jackie EX, EY n Checking power supplies 18:27
17:27 VAC Travis, Janos EX, EY n Checking vacuum pumps 18:09
17:53 PSL RyanS CR n PSL rotation stage sweep 18:09
17:55 ISC Daniel LVEA n Retrieving scope at PSL racks 18:09
17:57 VAC Jordan, Gerardo EX, EY - Installing vacuum gauges 19:15
18:12 ALS TJ CR n Testing ALS alignment w/ Y-arm 19:29
18:16 PEM Lance LVEA n Checking accelerometer cable 18:33
18:24 FAC Kim EX n Technical cleaning 19:47
18:27 VAC Janos, Fil LVEA n Roughing pump installation 19:20
18:43 FAC Tyler MX, MY n 3IFO checks 19:23
19:03 CDS Marc EX n Installing fan 19:32
19:06 VAC Gerardo, Jackie LVEA n Looking at flanges 19:28
19:16 CAL Tony PCal Lab n Returning equipment 19:35
19:30 OPS TJ LVEA n Sweep 19:47
19:36 TCS Camilla LVEA n Retrieving power meter 19:39
21:51 CAL Tony PCal Lab n Measurement 22:46
23:58 CAL Tony PCal Lab n Measurement 00:04