Reports until 15:39, Thursday 17 October 2013
H1 AOS
thomas.vo@LIGO.ORG - posted 15:39, Thursday 17 October 2013 - last comment - 21:27, Friday 18 October 2013(8151)
ITMX ACB in BSC3
Mitchell, Gerardo, Apollo (Scott, Randy, Tyler), Thomas

We got the suspension and the box into chamber and mounted onto stage-0.  The next steps are:

- Photodiode cabling
- Fine-tune alignment
- Check balance
- Set the eddy current dampening gap
- Wipe down
- Swing Back for first contact removal
Comments related to this report
thomas.vo@LIGO.ORG - 21:27, Friday 18 October 2013 (8180)
Filiberto C, Thomas V

We wanted to make sure that at least 3/4 of the photodiodes that were installed on the ITMX baffle worked since there were failures of all the other spares (under investigation). So after replacing a faulty cable, we found that all three have continuity and registered a signal when shined upon with a flashlight.  The PDs that work are PD1, PD2, and PD4, a mapping of their locations on the baffle can be found in E1100867 pg 21.