H1 is back to observing at 157Mpc as of 20:01 UTC following commissioning time. Activities included DetChar safety injections (alog81518), SQZ script testing and tuning (alog81516), and I ran a magnetic injection suite starting at GPS 1416771605 since that hasn't been done in some time. A calibration sweep was not done as H1 was not thermalized during this commissioning window.