The slab has been poured and finished, and the steel erection is well underway. Civil inspections took place today and I discussed with Jake a peripheral slab adjoined to the walking path to the man door for an air compressor. Insulation is beginning to get shaken out while siding and roofing goes up. Progress against the initial DGR schedule looks good.