Reports until 11:29, Friday 18 October 2013
H1 IOO
joseph.gleason@LIGO.ORG - posted 11:29, Friday 18 October 2013 (8162)
PR2 scraper baffles found to have been made with incorrect aperture
Clipping problems encountered in the PRC at LLO have led to the discovery that the PRC scraper baffle "Z Plates" were built with an aperture approximately 0.75" too small. The PR2 scraper baffle assembly installed in H1 will require removal and re-work. For more detail please see the following link to the LLO log.
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=9200