TITLE: 12/08 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
IFO is DOWN due to MICROSEISM/ENVIRONMENT since 22:09 UTC
First 6-7 hrs of shift were very calm and we were in OBSERVING for majority of the time.
The plan is to stay in DOWN and intermittently try to lock but the last few attempts have resulted in 6 pre-DRMI LLs with 0 DRMI acquisitions. Overall, microseism is just very high.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:03 | PEM | Robert | LVEA | YES | Finish setting up for Monday | 23:48 |
23:03 | HAZ | LVEA IS LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | 06:09 |