• Moving ISCT EX table from LVEA to air lock at end x -> Apollo • The dust monitor (unit#3) that was in the "beer garden" has been moved to the East door side of the BSC3 cleanroom -> Richard • Site fumigation -> Sprague • Installing cables into HAM 5 and 6 IO chassis -> Aaron • The front end computer was powered down to allow EE work on the IO Chassis of h1sush56 -> David