travis.sadecki@LIGO.ORG - posted 12:52, Tuesday 10 December 2024 (81733)
GV5 and GV7 cycled
GV5 and GV7 were soft closed at ~10am local time today to facilitate equipment craning for crane inspections. They were opened at ~11am local time at the completion of the vertex crane inspection.