(Corey, Jim)
Other than Mitch's never-ending background work of keeping us organized and handling tons of our parts, there was no BSC ISI Assembly work today (waiting for Optics Table Flipper hardware).
HAMISI#3 Removal Work
Re-payloaded the ISI, Balanced, and then Locked. At this point lots of grunt work occurred to get the ISI staged for removal: Shipping Brackets installed, most Walls removed for GS13 access, all (6) GS13's removed, masses removed from Optics Table, and Walls were re-installed.
Attached are photos of the weights on the Optics Table to balance it and the Shipping Brackets getting helicoiled.