Displaying report 1-1 of 1.
Reports until 16:28, Saturday 14 December 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:28, Saturday 14 December 2024 (81829)
OPS Eve Shift Start

TITLE: 12/15 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Wind
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 32mph Gusts, 26mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.62 μm/s
QUICK SUMMARY:

IFO is in ENVIRONMENT and LOCKING.

Getting hit by high microseism mixed with 40 mph gusts of wind is making locking difficult. We just ran initial alignment and are having some issues locking DRMI but wind seems to be coming down as does microseism.

 

Displaying report 1-1 of 1.