TITLE: 12/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Strong wind this morning with gusts into the 50s slowed down locking, but we made it up around the middle of the day. We are running with the EY ring heaters at 1.2W vs their usual 1.1W to avoid PIs. The LVEA was transitioned to laser hazard so Robert could go back out to the floor and check on some beam spots. Relocking was automatic, we've now been locked for 2 hours.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:53 | SAF | LVEA | LVEA | YES | LVEA IS LASER HAZARD | 00:38 |
17:15 | PEM | Robert | LVEA | n | Moving test setup | 17:20 |
17:39 | SAF | Oli | LVEA | n->YES | LVEA laser hazard transition | 18:04 |
17:44 | PEM | Robert | LVEA | YES | Beam spot investigation | 19:47 |
18:06 | FAC | Tyler, Richard, MacMiller | MY, EY | n | Chiller inspections | 18:31 |
19:48 | PCAL | Francisco, Dripta | PCAL lab | local | PCAL meas | 22:36 |