Reports until 09:05, Friday 13 May 2011
X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 09:05, Friday 13 May 2011 (819)
Quad 2 Testing
The ITM Quad 2 is on the test stand has been optically aligned. The BOSEMs are installed and tuned as per E1000494. The Quad is now ready for testing.