H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Monday 23 December 2024 (81954)
OPS Monday day shift summary

TITLE: 12/24 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism, Lock Aquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
LOG: Locking DRMI/PRMI was a big struggle today due to the elevated ground motion, it felt like the alignment was constantly running away. The picket fence seismometers are seeing so much ground motion from the ocean waves/tidal that they occasionally turn yellow as if there's an EQ for a few seconds. Primary microseism continues to rise even at the end of the shift.

Start Time System Name Location Lazer_Haz Task Time End
22:08 OPS LVEA LVEA N LASER SAFE 15:07
16:02 FAC Kim Labs N Tech clean 16:24
17:21 FAC Kim Receiving N Garb and trash 18:00
18:00 FAC Kim MidX N Tech clean 18:29
18:29 FAC Kim MidY N Tech clean 19:17
19:12 FAC Tyler X-Arm N Ensuring clear path for N2 fill tomorrow. 19:42
22:31 CAL Dripta PCAL lab LOCAL PCAL work 23:20
22:54 CAL Tony PCAL lab LOCAl PCAL work, beam centering 23:20
22:56 VAC Gerardo Wood shop N Drive stuff over 23:16

The TEST node was stuck on a channel timeout and its exc time was stuck increasing so I restarted the node, but on restart it couldn't connect to H1:GRD-ISC_LOCK_OP. Last time this happened I was able to fix it by stopping and re EXC the node but that didn't work this time.

Images attached to this report