Things happening:

From Morning Meeting:

SEI payloading at EX

Kill circuit for Prometheus laser being installed at EX (temporary mount)

ISC table being craned into place at EX

HAM6 cabling

Doug/Jason alignment at EY

Apollo moving scissor lift from MY to EY

Insulators continuing on X1

 

830 ACE septic

849 Mount Lock and Key along X-arm

910 Patrick restarting lab dust monitors

955 Corey installing TMSX cabling

1042 Mayflower metals swapping scrap recyling bin

1128 Sprague onsite, two vehicles

1200 Forklift Service onsite

1441 DAQ restart for dust monitor work