corey.gray@LIGO.ORG - posted 16:46, Friday 27 December 2024 (82012)
Fri Ops DAY Shift Summary

TITLE: 12/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

Today started off with addressing the HAM6 interlock which was no longer functioning due to missing the vacuum gauge it needs (i.e. the failed PT110 on HAM6 from last night!). 

Fil came in to take the BSC3 vacuum gauge to take the FAILED HAM6 vacuum gauge's place for the HAM6 interlock.  This would pull the BSC3 gauge from the interlock it was used for:  ITM ESDs---it was thought the ITM ESDs were NOT used.   Returned to locking, but then it was later brought up that the ITM ESD interlock is indeed needed for TRANSITION FROM ETMX.  

So we were on hold again.  

Ultimately it was decided to use the BSC3 vacuum gauge for BOTH the (1) HAM6 & (2) BSC3's ITMx ESD interlocks.  Fil came in (2nd time driving out to the site today!) to make this change in the afternoon.  

The hope is we are now back to a the state before the HAM6 gauge/interlock crashed last night, and Oli can return with locking.  Winds are lower than yesterday, BUT microseism is still high.  